i believe the grid control implementation guide (book by oracle press) has a 
very detailed account on how to do that i dont have the book with me right to 
point to the chapter
but  How To Configure Grid Control Components 
for High Availability [ID 330072.1]
can also help you .
If the hostname will be the same i.e move to  a new server   and discontinue 
old server  it is just a filesystem restore. i have done to move a complete 
stack from one server to another.
You can go with the safer route of adding another OMS . relocating targets to 
the new oms and then decomissioning the old OMS. i have nto had the chance to 
perform those steps yet.


________________________________
From: John Smith <john40855@xxxxxxxxx>
To: oracle-l@xxxxxxxxxxxxx
Sent: Sun, May 2, 2010 5:47:38 PM
Subject: move grid control to new server

We want to upgrade our grid control to a more powerful server.  We want to move 
the database and the middleware, ie the whole thing to the new server, and we 
would rather not have to re-create our scheduler jobs.  Can anyone point me to 
some documentation on how to do this migration?  I looked on the metalink, but 
could only find how to move the repository db. 