Hi Amit,

It is supported, so you can do hardware upgrades by adding new nodes to
your cluster, then deleting the old ones.

However, it is not recommended for sustained durations.  The huge imbalance
in CPU cores and memory may cause odd, asymmetrical loads on the
interconnect and result in strange gc waits.  Oh course, the risk would
likely be mitigated if the load wasn't very heavy, but with nodes as large
as you specified, I suspect you're expecting substantial workloads.

I would recommend running on identical hardware, and balancing your
workload so as to minimize interconnect traffic.

Hope that helps,

-Mark

On Fri, Jan 29, 2016, 04:55 AMIT VERMA <verma.labs@xxxxxxxxx> wrote:

Hello Everyone,

I was going through some design documents, there is case where two servers
has different hardware configuration mainly - CPU Cores & Physical RAM.
Below are the same for your reference.

Now, the requirement to setup RAC using both servers but I might think
there would be adverse effect of hardware in-compatible. Request you to
please share your thought on the same.

Server 1
------------
1. CPU Cores 1157
2. RAM is 64 GB

Server 2
-------------
1. CPU Cores 400
3. RAM is 256 GB

Thanks for your time.

Cheers,
Amit Verma