I have been upgrading our multiple 10g databases to 12.2 or a while now. Here
are the few things that I have come to make sure of on each upgrade:
1. Gather Dictionary and Fixed Object Stats before hand. Makes a difference
2. 12 seems to take considerable more memory than 10 did. I have had to
raise up SGA and PGA values considerably.
3. Processes had to be raised . It seemed that the upgrades were slower at
lower processes setting
4. Larger rollbacks with more groups. I used to have 4 groups with
relatively small files in them but when I changed that to 10 groups with larger
files the upgrades sped up
Some of these suggestions may not be thought of as being something that would
cause a faster upgrade, but it did it on our setup so I leave it to you to
consider or not.
Kevin
From: oracle-l-bounce@freelists.Stats org
[mailto:oracle-l-bounce@xxxxxxxxxxxxx] On Behalf Of Jeff Chirco
Sent: Monday, November 05, 2018 10:59 AM
To: oracle-l-freelistI
Subject: 12c upgrade slow
I am working on upgrading a database from 11.2.0.4 to 12.2.0.1. Single
instance non CDB. The upgrade is taking 2 hours and 50 minutes. I am running
the command line version of the upgrade and using parallel. Any tips to make
this go faster? I already have APEX 18.1 installed however I am noticing it is
becoming invalid during the upgrade and I have to reinstall it afterwards.
Thanks
This e-mail, including attachments, may include confidential and/or
proprietary information, and may be used only by the person or entity
to which it is addressed. If the reader of this e-mail is not the intended
recipient or his or her authorized agent, the reader is hereby notified
that any dissemination, distribution or copying of this e-mail is
prohibited. If you have received this e-mail in error, please notify the
sender by replying to this message and delete this e-mail immediately.