[ibis] CORRECTION: BIRD 189.5 Interconnect Modeling Using IBIS-ISS and Touchstone

  • From: Mike LaBonte <mlabonte@xxxxxxxxxx>
  • To: <ibis@xxxxxxxxxxxxx>
  • Date: Thu, 26 Apr 2018 09:44:44 -0400 (EDT)

Apologies for the errors: BIRD 189.5 is an update to 189.4, not 189.3. And 
the next IBIS Open Forum meeting will be held May 4, not tomorrow. Cut and 
paste error …



Mike



From: Mike LaBonte <mlabonte@xxxxxxxxxx>
Sent: Thursday, April 26, 2018 9:42 AM
To: 'ibis@xxxxxxxxxxxxx' <ibis@xxxxxxxxxxxxx>
Subject: BIRD 189.5 Interconnect Modeling Using IBIS-ISS and Touchstone



BIRD 189.5,  <https://ibis.org/birds/bird189.5.docx> Interconnect Modeling 
Using IBIS-ISS and Touchstone, has been submitted by Walter Katz of Signal 
Integrity Software (SiSoft), Radek Biernacki of Keysight Technologies, 
Justin Butterfield and Randy Wolff of Micron Technology, Curtis Clark of 
ANSYS, Mike LaBonte of SiSoft, Arpad Muranyi of Mentor Graphics, Michael 
Mirmak of Intel Corp., and Bob Ross of Teraspeed Labs. It will be introduced 
as an update to BIRD 189.3 in the next IBIS Open Forum teleconference, 
tomorrow.




ID#

Issue Title

Requester

Date
Submitted


189.5

Interconnect Modeling Using IBIS-ISS and Touchstone 
<http://ibis.org/birds/bird189.5.docx>

Walter Katz, Signal Integrity Software (SiSoft); Radek Biernacki, Keysight 
Technologies; Justin Butterfield, Micron Technology; Curtis Clark, ANSYS; 
Mike LaBonte, Signal Integrity Software (SiSoft); Arpad Muranyi, Mentor 
Graphics; Michael Mirmak, Intel Corp.; Bob Ross, Teraspeed Labs; Randy 
Wolff, Micron Technology

January 27, 2017, March 29, 2017; April 19, 2017; April 26, 2017; June 22, 
2017; April 25, 2018



Mike LaBonte
SiSoft
Chair, IBIS Open Forum
 <http://www.ibis.org/http://www.ibis.org/

Other related posts:

  • » [ibis] CORRECTION: BIRD 189.5 Interconnect Modeling Using IBIS-ISS and Touchstone - Mike LaBonte