IBIS Macromodel Task Group

Meeting date: 17 July 2012

Members (asterisk for those attending):
Agilent:                      Fangyi Rao
                            * Radek Biernacki
Altera:                     * David Banas
                              Julia Liu
                            * Hazlina Ramly
Andrew Joy Consulting:        Andy Joy
Ansys:                        Samuel Mertens
                            * Dan Dvorscak
                            * Curtis Clark
                            * Steve Pytel
Arrow Electronics:            Ian Dodd
Cadence Design Systems:       Terry Jernberg
                            * Ambrish Varma
                              Feras Al-Hawari
Cavium Networks:            * Johann Nittmann
Celsionix:                    Kellee Crisafulli
Cisco Systems:                Ashwin Vasudevan
                              Syed Huq
Ericsson:                     Anders Ekholm
IBM:                          Greg Edlund
Intel:                      * Michael Mirmak
LSI Logic:                    Wenyi Jin
Maxim Integrated Products:  * Mahbubul Bari
Mentor Graphics:            * John Angulo
                              Zhen Mu
                            * Arpad Muranyi
                              Vladimir Dmitriev-Zdorov
Micron Technology:            Randy Wolff
                            * Justin Butterfield
NetLogic Microsystems:        Ryan Couts
Nokia-Siemens Networks:     * Eckhard Lenski
QLogic Corp.                * James Zhou
Sigrity:                    * Brad Brim
                              Kumar Keshavan
                              Ken Willis
SiSoft:                     * Walter Katz
                              Todd Westerhoff
                              Doug Burns
                            * Mike LaBonte
Snowbush IP:                  Marcus Van Ierssel
ST Micro:                     Syed Sadeghi
Teraspeed Consulting Group: * Scott McMorrow
                            * Bob Ross
TI:                           Casey Morrison
                              Alfred Chong
Vitesse Semiconductor:        Eric Sweetman
Xilinx:                       Mustansir Fanaswalla
                            * Ray Anderson

NOTE: An unidentified caller joined about 44 minutes into the meeting.

The meeting was led by Arpad Muranyi

------------------------------------------------------------------------
Opens:

- Michael M: I may be called away briefly

--------------------------
Call for patent disclosure:

- None

-------------
Review of ARs:

- Bob to propose a simpler way for addressing the needs of parameter passing
  under [External Model] and [External Circuit]
 - not done

-------------
New Discussion:

Arpad introduced the topic of package modeling improvements:
- Arpad: The need goes beyond electrical modeling changes.
  - We may need to review the fundamental syntax for package models.
  - We need to hear from model makers on this.

Michael M showed a presentation "Package Model Format Needs":
- Slide 2:
  - Michael M: The models described here are for customer use.
    - Users create the connection between the package and the buffers/system 
themselves.
    - Scripts may be provided to assist with this.
- Slide 4:
  - For SerDes we usually do not provide structural data.
  - Current work typically models 3 diff pairs.
    - These are often pair coupled, sometimes all 6 coupled together.
  - W-line lengths are passed in from outside using params.
  - Sometimes a 9 corner structure is needed if model portions don't change the 
same way.
  - The models are oriented toward time domain analysis.
  - Walter: This assumes no crosstalk between TX and RX?
  - Michael M: There is a strong tendency to not use interleaving.
  - Walter: That is not the case for all IC vendors.
    - All SPICE elements can be represented in IBIS-ISS?
  - Michael M: Yes, but that is not tested.
  - Walter: An s12p could be created and used in frequency domain because it is 
LTI.
  - Michael M was called away
  - Scott: The 3 diff pair limitation is arbitrarily small.
    - It should support an arbitrary count.
  - Arpad: Agree.
  - Walter: We have seen 4 aggressors in the package itself.
    - The pin field underneath may be different.
  - Scott: At 25G-30G nearly everything in the package is significantly coupled.
    - It can be around -40dB.
  - Arpad: What is the significance of the question about FEXT?
  - Walter: With NEXT the victim is on the same chip as the aggressor.
    - Aggressor and victim tap coefficients are the same.
    - The near end crosstalk can be disastrous.
  - Michael M: About the s12p question we try to avoid s-parameters.
    - It works somewhat poorly in time domain.
  - Johann: The w-element is good for frequency domain.
    - The difficulty is converting back to time domain?
  - Michael M: Yes, although this does not apply to all use in the time domain.
  - Johann: Lengths must be given for the w-elements.
    - This gives away structural information.
  - Michael M: We are not providing detailed geometry, only some lengths.
    - There is no layout information.
- Slide 5:
  - Michael M: For memory parts the main difference is that a 10 line structure 
is recommended.
  - Arpad: Is the netlist the same across corners?
  - Michael M: The topology is the same but the cross section can change.
    - Usually circuit names change.
    - Users might not be able to implement corners using parameters.
  - Walter: Passing the name of a w-line might help.
    - For DDR3 the DQS signal sometimes comes from the TX, sometimes from the 
RX.
    - This might violate NEXT/FEXT assumptions.
  - Michael M: There is no TX/RX line on this slide.
    - Direction should not be a package model problem.
  - Steve: It should allow for power and ground rails.
  - Walter: Can the power/ground sections be independent of signals?
  - Scott: It depends.
    - In a wirebond package they are coupled together strongly.
    - In a stripline with signals between P&G planes there is coupling.
  - Steve: DDR4 will be even more difficult.
  - Walter: Should simulators use something like MCP to stitch pieces together?
    - An IBIS limitation is the resource of peoples' time.
    - Coupling power and signal in the package increases the problem for IBIS 
exponentially.
- Slide 6:
  - Michael M: A generic format should not require physical information.
    - It should be "drop in" for users but "free form" for model makers.
    - It must be more compelling than a SPICE subcircuit.
  - Arpad: Is this different from the BIRD 125 proposal?
  - Michael M: Based on the "don't make me think" principle, yes.

Mahbubul: Is there a specific proposal associated with this?
- Arpad: No.
- Walter: It mostly identifies the structures most commonly used.

Arpad: We need to think about what to do next.
- Please send any feedback on BIRD 125.
- Walter: We should think about using BIRD 125 for Michael's circuits.

-------------
Next meeting: 17 Jul 2012 12:00pm PT

Next agenda:
1) Task list item discussions

-------------
IBIS Interconnect SPICE Wish List:

1) Simulator directives

Other related posts: