Hi folks.
I am configuring a kind of ratio control loop, with an architecture like
this:
PID1.SPT -> CALC -> PID2.SPT
I would like to implement a ramp between CALC and PID2, but the block RAMP
does not appear to be the best approach. LLAG can be used, but the answer
will not be linear.
Any ideas?
Thanks in advance,
Farina