HI ALL:
THERE IS A SQUARE OF ASPHALT THAT WAS REPLACED LAST YEAR IN FRONT OF UNIT 825
THAT IS STARTINGTO CRUMBLE. THIS AREA IS NOW ABOUT 5 X 5 INCHES. THIS IS
STARTING TO SHOW THE INNER LAYERSOF STONES. THIS AREA NEEDS TO BE BLACKTOP
COATED. ALSOTHE DRIVEWAYS ARE DUE FOR A COATING. LAST COATING DONE SEPT.
2017 AND SHOULD BE DONE EVERY2-3 YEARS, SO IT IS 3 YEARS NOW. THIS WILL KEEP
THEM FROM DETERIORATING.