Dear Alex,

Piling work for foundations of industrial trainwash building behind Great 
Eastern Street, CB1 in July 2020.

We want to express our deep concern about the proposed piling work to be done 
over the next three weekends in July on this site.

Firstly, potential vibration damage to buildings.  We consider it highly 
irresponsible for this work to be carried out without an extensive survey on 
potential damage to surrounding properties, but particularly on Great Eastern 
Street. What data is available to the Cambridge City Council on the affect of 
deep-piling to Victorian terrace buildings, many within less than 50 meters of 
the piling work?

Of note is the fact that in the recent Spencer Group circular sent to Great 
Eastern Street households, although it spoke of the upcoming ‘foundation work’, 
it did not mention the specific nature of that work as piling – which as 
everyone knows creates considerable noise and ground vibration.

Second, noise and timing of work. The amount of noise that will be made from 
this this work at 3 am in a residential area - particularly one housing elderly 
people, children and adults working shifts -borders on cruelty and criminal 
harm.

We would like to see this work stopped.

Yours faithfully,
Dr Sian Stumbles, Peter Joseph
Great Eastern Street


From: cambtrainwash-bounce@xxxxxxxxxxxxx <cambtrainwash-bounce@xxxxxxxxxxxxx> 
On Behalf Of Elizabeth Mozzillo-Howell
Sent: 08 July 2020 10:09
To: cambtrainwash@xxxxxxxxxxxxx
Cc: Cllr Dave Baigent - (Cambridge City - Romsey) 
<dave.baigent@xxxxxxxxxxxxxxxx>; Louis T Koehorst <ted@xxxxxxxxxxxxxx>; 
celiakenney@xxxxxxxx; ediestuart@xxxxxxxxx; giumorse@xxxxxxxxxxx; 
philip.howell@xxxxxxxxxxxxxx; Anne-Sophie Bretonnet <abretonn@xxxxxxxx>; Hannah 
Fromageau <hannahfromageau@xxxxxxxxx>; Martin Kulander 
<martin.kulander@xxxxxxxxx>; Priyananda Joseph <mail@xxxxxxxxxxxxxx>; Info 
Quashthetrainwash <info@xxxxxxxxxxxxxxxxxxxxx>
Subject: [cambtrainwash] Re: July 11th work at night

I have this morning written to both Alex Nix and Stephen Kelly. Thank you Ted 
for bringing up the true nature of this 'foundation' work through your 
correspondence with Alex Nix.

Elizabeth
On 7 Jul 2020, at 20:54, Sean Rintel 
<seanrintel@xxxxxxxxx<mailto:seanrintel@xxxxxxxxx>> wrote:


Will do.

________________________________
From: Cllr Dave Baigent - (Cambridge City - Romsey) 
<dave.baigent@xxxxxxxxxxxxxxxx<mailto:dave.baigent@xxxxxxxxxxxxxxxx>>
Sent: Tuesday, July 7, 2020 7:57:41 PM
To: Louis T Koehorst <ted@xxxxxxxxxxxxxx<mailto:ted@xxxxxxxxxxxxxx>>; Sean 
Rintel <seanrintel@xxxxxxxxx<mailto:seanrintel@xxxxxxxxx>>
Cc: cambtrainwash@xxxxxxxxxxxxx<mailto:cambtrainwash@xxxxxxxxxxxxx
<cambtrainwash@xxxxxxxxxxxxx<mailto:cambtrainwash@xxxxxxxxxxxxx>>; 
celiakenney@xxxxxxxx<mailto:celiakenney@xxxxxxxx
<celiakenney@xxxxxxxx<mailto:celiakenney@xxxxxxxx>>; 
ediestuart@xxxxxxxxx<mailto:ediestuart@xxxxxxxxx
<ediestuart@xxxxxxxxx<mailto:ediestuart@xxxxxxxxx>>; 
giumorse@xxxxxxxxxxx<mailto:giumorse@xxxxxxxxxxx
<giumorse@xxxxxxxxxxx<mailto:giumorse@xxxxxxxxxxx>>; 
philip.howell@xxxxxxxxxxxxxx<mailto:philip.howell@xxxxxxxxxxxxxx
<philip.howell@xxxxxxxxxxxxxx<mailto:philip.howell@xxxxxxxxxxxxxx>>; 
Anne-Sophie Bretonnet <abretonn@xxxxxxxx<mailto:abretonn@xxxxxxxx>>; Dave 
Baigent <Dave.Baigent@xxxxxxxxxxxxxxxx<mailto:Dave.Baigent@xxxxxxxxxxxxxxxx>>; 
Hannah Fromageau <hannahfromageau@xxxxxxxxx<mailto:hannahfromageau@xxxxxxxxx>>; 
Martin Kulander <martin.kulander@xxxxxxxxx<mailto:martin.kulander@xxxxxxxxx>>; 
Touching Health <mail@xxxxxxxxxxxxxx<mailto:mail@xxxxxxxxxxxxxx>>; Info 
Quashthetrainwash 
<info@xxxxxxxxxxxxxxxxxxxxx<mailto:info@xxxxxxxxxxxxxxxxxxxxx>>
Subject: Re: July 11th work at night


Can I suggest that you/sean write to Stephen Kelly and ask him to put a stop on 
it.  Copy me in and I will make a phone call
😊

dave


From: Louis T Koehorst <ted@xxxxxxxxxxxxxx<mailto:ted@xxxxxxxxxxxxxx>>
Date: Tuesday, 7 July 2020 at 19:13
To: Info Quashthetrainwash 
<info@xxxxxxxxxxxxxxxxxxxxx<mailto:info@xxxxxxxxxxxxxxxxxxxxx>>
Cc: "cambtrainwash@xxxxxxxxxxxxx<mailto:cambtrainwash@xxxxxxxxxxxxx>" 
<cambtrainwash@xxxxxxxxxxxxx<mailto:cambtrainwash@xxxxxxxxxxxxx>>, 
"celiakenney@xxxxxxxx<mailto:celiakenney@xxxxxxxx>" 
<celiakenney@xxxxxxxx<mailto:celiakenney@xxxxxxxx>>, 
"ediestuart@xxxxxxxxx<mailto:ediestuart@xxxxxxxxx>" 
<ediestuart@xxxxxxxxx<mailto:ediestuart@xxxxxxxxx>>, 
"giumorse@xxxxxxxxxxx<mailto:giumorse@xxxxxxxxxxx>" 
<giumorse@xxxxxxxxxxx<mailto:giumorse@xxxxxxxxxxx>>, 
"philip.howell@xxxxxxxxxxxxxx<mailto:philip.howell@xxxxxxxxxxxxxx>" 
<philip.howell@xxxxxxxxxxxxxx<mailto:philip.howell@xxxxxxxxxxxxxx>>, 
Anne-Sophie Bretonnet <abretonn@xxxxxxxx<mailto:abretonn@xxxxxxxx>>, Dave 
Baigent <Dave.Baigent@xxxxxxxxxxxxxxxx<mailto:Dave.Baigent@xxxxxxxxxxxxxxxx>>, 
Hannah Fromageau <hannahfromageau@xxxxxxxxx<mailto:hannahfromageau@xxxxxxxxx>>, 
Martin Kulander <martin.kulander@xxxxxxxxx<mailto:martin.kulander@xxxxxxxxx>>, 
Touching Health <mail@xxxxxxxxxxxxxx<mailto:mail@xxxxxxxxxxxxxx>>
Subject: July 11th work at night


Hi all,

A heads up regarding the late night early morning work Spencers are doing July 
11/12th, 18/19th, 25/26th.


I have just been informed by Alex Nix that the 'work' starting Saturday night 
July 11th being done by Spencers involves 'piling'. This was not mentioned in 
the letter, only foundation work etc. This I have been told requires the power 
to be shut off as they will be connecting power lines.


I have been told 'piling' will commence at 3am Sunday. Apparently only one pile 
will be at this time pout in...


I know now why piling was not mentioned in the 'newsletter' we received.


'Piling is a type of deep foundation, used to transfer the load to a deeper 
level than is possible with a traditional shallow foundation. Vertical columns 
of concrete, steel or wood, or a combination, are driven deep into the ground 
to give extra support'


https://www.youtube.com/watch?v=02UjH6DrY94

from 3.10 mins onwards and you will hear this and how loud it is and the 
repetitive nature. I have been told it is set to run for an hour... but I am 
guessing it will run for as long as it takes.


Railway piling work is a very noisy operation and creates a lot of vibration.

 This happen three years ago in Preston... some comments... "3 and a half hours 
the other week my house was shaking and vibrating , pictures on the walls 
rattling and furniture almost moving , certainly can not be good for the 
structure of the houses that's for sure , the bright lights and machinery are 
awful but that piling noise is unbearable"

https://www.blogpreston.co.uk/2017/05/network-rail-to-carry-out-overnight-piling-on-preston-to-blackpool-line/


https://www.peterboroughmatters.co.uk/local-news/peterborough-overnight-network-rail-work-9114


I have asked Mr Nix if any assessment been done by Spencers on possible damage 
to foundations of our homes on Great Eastern Street as a result of 'piling' so 
close to our homes. I also asked why the work being carried out did not detail 
'piling' until I asked Mr Nix to ask specifically what Spencers were doing in 
the night/morning.


Asking a friend whose brother is an engineer what his knowledge base is on 
piling as he worked for an engineering form doing railway work he said it will 
be heard up to 1 km away and is loud, very loud.

He also said foundation damage is possible unless a detailed and in depth 
structural annalysis has been done on the surrounding area.


So it will be very noisy and possible foundation damage. Apparently there is 
nothing we can do about this...


Mr Nix mentioned that no one else had raised queries or objections but then 
'piling' was not mentioned in the 'newsletter'...

Maybe if more queried the necessity of 'piling' at the crack of dawn is really 
a fact or just a convenience and why no consultation or survey done on possible 
damage to our homes foundations and we then informed checks on that possibility 
done.

email Alex.Nix@xxxxxxxxxxxxxxxx<mailto:Alex.Nix@xxxxxxxxxxxxxxxx>


Unfortunately two members of my household have to work Sunday and have to start 
work early. I have no idea how being awoken at 3am will impact on them.


Any ideas?



Cheers Ted (47)



Disclaimer

The information contained in this communication from the sender is 
confidential. It is intended solely for use by the recipient and others 
authorized to receive it. If you are not the recipient, you are hereby notified 
that any disclosure, copying, distribution or taking action in relation of the 
contents of this information is strictly prohibited and may be unlawful.

This email has been scanned for viruses and malware, and may have been 
automatically archived

Other related posts: