[burpg] Re: RPG Schedule

  • From: Cory Absi <cory.absi@xxxxxxxxx>
  • To: "burpg@xxxxxxxxxxxxx" <burpg@xxxxxxxxxxxxx>
  • Date: Sat, 7 Dec 2013 13:15:18 -0500

I prefer soccer dad...

Sent from my iPhone

> On Dec 6, 2013, at 11:19 PM, Armor Harris <armorharris@xxxxxxxxx> wrote:
> 
> Additionally, the GSE software people need to read this document and make 
> sure that they're ready to do everything in it by the dry run on Friday 
> afternoon (except anything that says RCS). Black text indicates commands that 
> are initiated automatically via the software, blue text indicates commands 
> that are initiated manually, and red text indicates abort modes that are 
> called manually in the event that something bad happens. 
> 
> For the aborts, we've got two options and it's up to you guys how we want to 
> handle it. Either the software knows where in the countdown we are and just 
> has one big red abort button that triggers Safety 1 for that step 
> or
> We have easy enough control over all of the components in the system that we 
> can manually perform any abort by closing or opening individual valves or 
> whatever. 
> 
> 
> 
>> On Fri, Dec 6, 2013 at 7:21 PM, Kelley, Andrew, Todd <atkelley@xxxxxx> wrote:
>> I need to see the Ground Control Software people at some point tomorrow to 
>> go over a complete list of everything we need to be monitoring/have control 
>> of. Please come in around 2:30 with your laptops and be prepared to stay for 
>> an hour or two.
>> 
>>  
>> 
>>  
>> 
>> Drew Kelley
>> 
>> Boston University
>> 
>> Computer Engineering ‘14
>> 
>>  
>> 
>> Chief Project Engineer
>> 
>> ANDESITE Satellite Program
>> 
>>  
>> 
>> Vice Director
>> 
>> Rocket Propulsion Group
>> 
>> http://www.burocket.org
>> 
>>  
>> 
>> From: burpg-bounce@xxxxxxxxxxxxx [mailto:burpg-bounce@xxxxxxxxxxxxx] On 
>> Behalf Of Michael Pettit
>> Sent: Friday, December 06, 2013 6:02 PM
>> To: burpg@xxxxxxxxxxxxx
>> Subject: [burpg] Re: RPG Schedule
>> 
>>  
>> 
>> You can add me for soccer mom #2 on the 14th. I'll have the same car as 
>> always that can fit five people including myself. 
>> 
>> On Friday, December 6, 2013, D. Armor Harris wrote:
>> 
>> Work Session: 10am Saturday 12/7 including E-Reg controls bench test
>> 
>>  
>> 
>> Note that the shops are going to shut down on Wednesday, so everything that 
>> has to be machined has to be done by the end of the day on Wednesday. 
>> 
>>  
>> 
>> Coordination Meeting: 7pm Monday, 12/9 
>> 
>>  
>> 
>> Everyone who is involved in the cold flow, and especially the people on the 
>> list below are required to be there at the meeting on Monday. 
>> 
>>  
>> 
>> Rocket and Test Stand Assembly: Friday 12/13
>> 
>>  
>> 
>> Dry Run in wind tunnel lab: Friday 12/13 at 4pm 
>> 
>>  
>> 
>> Cold Flow: Saturday 12/14 at 9am 
>> 
>>  
>> 
>> ·  E-Regulator Housing- Mehmet
>> 
>> ·  Firestarter Disconnect Housing #433- Daniel Poe
>> 
>> ·  Firestarter- Dean
>> 
>> ·  E-Regulator Controls- Drew
>> 
>> ·  FCU- Drew
>> 
>> ·  Cables- Joe Beaupre
>> 
>> ·  Ground Control Software- Abessari, Mirek, Brandon, Anish 
>> 
>> ·  Firestarter ULD- Carolina
>> 
>> ·  Nitrous Transporter- Alessandro
>> 
>> ·  Nitrous GSE Plumbing- Felix and Ashley
>> 
>> ·  3x Test Stand Transporters- Sindel
>> 
>> ·  2x GN2 6ksi Ground Valves- Mehmet
>> 
>> ·  3x N2O 1ksi Ground Valves- Ben Ha
>> 
>> ·  12x Pyro Bolts, threaded for nuts- Halstead
>> 
>> ·  U-Haul logistics- Ben Ha
>> 
>> ·  Soccer Mom for Saturday- Cory
>> 
>> 
>> 
>>  
>> 
>> --
>> 
>> David Armor Harris
>> 
>> Boston University Rocket Propulsion Group
>> 
>> davidh@xxxxxx
>> 
> 
> <Coutdown Sequence.docx>