Using an IBIS model, I would like to determine the time it takes for the voltage at the end of a transmission line to reach Vihmin from a clocked output. As I understand it, IBIS output is not referenced from a clock output and does not include chip delays. If this is correct, is it possible to load the IBIS model with the load as specified in the device data sheet (usually a 50pf lumped load or infinitely long transmission line), and add a delay to the output of the model such that the time to reach the specified output voltage matches the data sheet? Then this delay can be used with the IBIS model and the transmission line of interest to determine settling time. If IBIS cannot be used to determine clock to settling time, then it seems it's only useful for designing transmission lines and not timing analysis. ------------------------------------------------------------------ To unsubscribe from si-list: si-list-request@xxxxxxxxxxxxx with 'unsubscribe' in the Subject field or to administer your membership from a web page, go to: //www.freelists.org/webpage/si-list For help: si-list-request@xxxxxxxxxxxxx with 'help' in the Subject field List archives are viewable at: //www.freelists.org/archives/si-list or at our remote archives: http://groups.yahoo.com/group/si-list/messages Old (prior to June 6, 2001) list archives are viewable at: http://www.qsl.net/wb6tpu