[SI-LIST] Determining timing budgets using IBIS
- From: "Alex Horvath" <alexh1@xxxxxxxxxxxxx>
- To: <si-list@xxxxxxxxxxxxx>
- Date: Fri, 26 Jul 2002 20:28:43 -0700
Using an IBIS model, I would like to determine the time it takes for the
voltage at the end of a transmission line to reach Vihmin from a clocked
output. As I understand it, IBIS output is not referenced from a clock output
and does not include chip delays.
If this is correct, is it possible to load the IBIS model with the load as
specified in the device data sheet (usually a 50pf lumped load or infinitely
long transmission line), and add a delay to the output of the model such that
the time to reach the specified output voltage matches the data sheet?
Then this delay can be used with the IBIS model and the transmission line of
interest to determine settling time.
If IBIS cannot be used to determine clock to settling time, then it seems it's
only useful for designing transmission lines and not timing analysis.
------------------------------------------------------------------
To unsubscribe from si-list:
si-list-request@xxxxxxxxxxxxx with 'unsubscribe' in the Subject field
or to administer your membership from a web page, go to:
http://www.freelists.org/webpage/si-list
For help:
si-list-request@xxxxxxxxxxxxx with 'help' in the Subject field
List archives are viewable at:
http://www.freelists.org/archives/si-list
or at our remote archives:
http://groups.yahoo.com/group/si-list/messages
Old (prior to June 6, 2001) list archives are viewable at:
http://www.qsl.net/wb6tpu
Other related posts: