move grid control to new server

  • From: John Smith <john40855@xxxxxxxxx>
  • To: oracle-l@xxxxxxxxxxxxx
  • Date: Sun, 2 May 2010 17:47:38 -0500

We want to upgrade our grid control to a more powerful server.  We want to
move the database and the middleware, ie the whole thing to the new server,
and we would rather not have to re-create our scheduler jobs.  Can anyone
point me to some documentation on how to do this migration?  I looked on the
metalink, but could only find how to move the repository db.

Other related posts: