RE: Lets load test

 
OK then, sure. Test fault injections. Fire
up some heavily modify intensive workload (e.g.,
conventional path loads concurrently, several concurrent
CTAS statements, etc) and drive the I/O up as far as 
possible then reach back to the HBA and pull the gbic.
After Oracle melts down, reinstate the path to the
SAN.  Make sure ASM and Oracle can come up. Do this
a few times.
--
http://www.freelists.org/webpage/oracle-l


Other related posts: