RE: Lets load test
- From: "Kevin Closson" <kevinc@xxxxxxxxxxxxx>
- To: "Oracle-L" <oracle-l@xxxxxxxxxxxxx>
- Date: Wed, 14 Dec 2005 13:32:03 -0800
OK then, sure. Test fault injections. Fire
up some heavily modify intensive workload (e.g.,
conventional path loads concurrently, several concurrent
CTAS statements, etc) and drive the I/O up as far as
possible then reach back to the HBA and pull the gbic.
After Oracle melts down, reinstate the path to the
SAN. Make sure ASM and Oracle can come up. Do this
a few times.
--
http://www.freelists.org/webpage/oracle-l
- Follow-Ups:
- Re: Lets load test
- From: Christo Kutrovsky
Other related posts:
- » Lets load test
- » Re: Lets load test
- » RE: Lets load test
- » Re: Lets load test
- » RE: Lets load test
- » Re: Lets load test
- » Re: Lets load test
- » Re: Lets load test
- » RE: Lets load test
- » Re: Lets load test
- » RE: Lets load test
- » Re: Lets load test
- Re: Lets load test
- From: Christo Kutrovsky