Testing for the DST time changes is being planned here. It's actually
going to have a minimal impact, but the testing needs to happen.
Anyway, the request is to change the server level dates to the second
Sunday in March to simulate the DST change.
I understand that Oracle should/doesn't use the system dates to keep
transaction continuity. I was about to give my input that changing the
system date should not have an issue on the database itself until I ran
into metalink note # 253977.1
That note says:
"While opening the database, Oracle compares the given SCN value
with the reasonable upper limit value calculated based on the
system date. If Oracle detects the provided scn is too large,
ORA-600[2252] would be raised."
Now I'm a little concerned that when we change the system date back to
the current correct date, I might have issues.
Anyone have any experience with this?
Steve Smith
Envision Technology Partners / MSHA MSIS Team
Desk: 303-231-5499
- Follow-Ups:
- RE: Large system level date changed
- From: Mark W. Farnham
- RE: Large system level date changed
- From: Bobak, Mark
- Re: Large system level date changed
- From: DIANNA GIBBS
- References:
- ORACLE-L dinner/drinks at RMOUG "Training Days" on Wed 14-Feb
- From: Tim Gorman
Other related posts:
- RE: Large system level date changed
- From: Mark W. Farnham
- RE: Large system level date changed
- From: Bobak, Mark
- Re: Large system level date changed
- From: DIANNA GIBBS
- ORACLE-L dinner/drinks at RMOUG "Training Days" on Wed 14-Feb
- From: Tim Gorman