Hi everyone, I need to move 1TB or more data (100 STATIC tables) from client back to our database here through delicate T1 line between the 2 databases using DB Link. Our client is running on Oracle 8.1.7.0 <http://8.1.7.0/> on AIX and our box is on Oracle 10.1.0.3 <http://10.1.0.3/> on Sun Solaris. This is how I plan to attack the problem. I have approximate 3 weeks to transfer over (24 hours) 1. Execute Exp/Imp for all small tables with compress using dblink in our box. 2. Using Copy or Insert (DB Link) command to move data by YEAR (One at the time) for some other BIG tables (100GB) since the columns in the table will be naming little different then original table. Please advice me the CON & PRO or another solutions about this sceniaro. Thanks in advance, Vu